Majimba Exploration- Mbuji Mayi Valley

  • Democratic Republic of Congo: Mbuji Mayi (MJM) Valley historically significant for diamond exploration and mining- approx. 20% of total world historical carat production.
  • The confirmed Targets have the potential of delivering “mid-tier” mines- mapping has been concluded and sampling and evaluation to be completed in a Phased approach.
  • Massive potential project value uplift (first confirmed new African kimberlite discovery in a decade).
  • Skilled technical and operational team (experience: Angola, Botswana, Sierra Leone, Lesotho, Namibia, South Africa, DRC, Central African Republic, Gabon, Zimbabwe, Australia, Canada, Russia).
  • The current information in the possession of management equates to approximately 5 years of exploration work to identify evaluation targets.

Team Philosophy

  • flat management- strong in-country management team and operational presence
  • low cost operating structure present “in-country”
  • Entrepreneurial spirit – innovation, value creation, ability to independently complete the evaluation process
  • Best practice followed: from technical design to Kimberley Process compliance
  • Track record of delivery: geology, process engineering, mining, marketing
  • Diverse skills network
  • Excellent reputation in diamond industry
  • Strong knowledge of diamond deposits worldwide

Phase 1

Existing Infrastructure and Equipment

Phase 1 Budget: ca. $3.1M

Initial Risk Capital to initiate Project:
$ 850 000 (included in Phase 1 budget)

Deliverables:

  • Due diligence – NewCo with Tenure.
  • Upgrade MJM Base and acquire transport and equipment.
  • Geophysical surveys over Target 1, 2 and 3 area to determine size, shape and resolve anomalies (Target 2 and 3).
  • Microdiamond (MiDa) analyses of Target 2 and 3.
  • Formalise Earn-In Agreement for all phases.

Phase 2

Sampling plant setup and microdiamond analyses

Phase 2 Budget: ca. $4.8M  

Deliverables:

  • Construct 20tph sampling plant in South Africa (RSA).
  • Transport sampling plant to DRC site.
  • Complete MiDa analyses and assess results for Target 2 and 3.
  • To continue with production once evaluation of Target 1, 2 and 3 is completed, until an appropriate unit for the project is sized, acquired and commissioned.

20TPH SAMPLING PLANT

Plant Specifications:

  • 20tph Modular skid mounted primary and secondary crushing plant.

oFeed preparation plant.

oScrubbing module.

oInterplant conveyors, electrics, piping and process water pump.

  • 10tph DMS complete with catch sump.
  • Containerised Flowsort™ recovery unit with single pass x-ray and ancillaries.
  • 550kVa Generator.

Including cabling between gensets and MCC’s

Phase 3

Evaluation of Target 1 kimberlite pipe and Target 2 and 3 anomalies, if positive

Phase 3 Budget; ca.$7.45M

Deliverables:

  • Target 1 sample to generate 3,000 cts for grade (carats per cubic metre) and revenue profile (US$/ct per size class).
  • Target 2 and 3, if positive, sample to generate 3,000 cts each for grade (carats per cubic metre) and revenue profile (US$/ct per size class).
  • Plant centrally located to process Target 1 and 2 samples, with additional infrastructure only required for Target 3.

Phase 4

SAMREC Equivalent Competent Person’s Report (CPR) and Preliminary Economic Assessment (PEA).

Phase 3 Budget; ca.$7.45M

Deliverables:

  • Target 1 sample to generate 3,000 cts for grade (carats per cubic metre) and revenue profile (US$/ct per size class).
  • Target 2 and 3, if positive, sample to generate 3,000 cts each for grade (carats per cubic metre) and revenue profile (US$/ct per size class).
  • Plant centrally located to process Target 1 and 2 samples, with additional infrastructure only required for Target 3.

CURRENT DREDGING OPERATION

SAMREC Equivalent Competent Person’s Report (CPR) and Preliminary Economic Assessment (PEA).

  • Three 8” dredging units with accessory equipment including, dinghies, jig recovery, bathymetric survey unit, tented camp as well as 5-ton truck, motorbikes and LDVs (support vehicles).
  • Management team on the ground with strong in-country and operational knowledge of the DRC diamond bearing rivers.
  • Dredge targets on and adjacent to the kimberlite target concession area.
  • Dredging budget – Immediate $400 000 – totaling $4.1 million over three-year period.